| Commit message (Collapse) | Author | Age |
... | |
|\ |
|
| |\
| | |
| | | |
Now honors protections
|
| | | |
|
| | |\
| | |/
| |/| |
|
| | | |
|
| | | |
|
| | | |
|
| | | |
|
| | | |
|
|/ / |
|
| | |
|
|/ |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
|
|
|
| |
switching
|
| |
|
| |
|
|
|
|
| |
it is controllable by mesecons and by right click. it does not influence trains
|
| |
|
| |
|
|
|
|
| |
because it caused confusion
|
| |
|
|
|
|
|
| |
1. you can't place tracks on non-walkable nodes
2. in certain situations no rail was placed at all
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
|
|
|
| |
implement benchmarking better and optimize some things
|
| |
|
|
|
|
| |
do that does not work.
|
|
|
|
| |
used on from the beginning (ad fix some logical mistakes)
|
| |
|
| |
|
| |
|
| |
|
|
|
|
| |
registration a lot more modular
|
| |
|
| |
|
| |
|