Commit message (Collapse) | Author | Age | |
---|---|---|---|
* | Added on_train_approach callback, non-permanent external LZB brakepoints and ↵ | orwell96 | 2018-11-29 |
| | | | | | | basis for "stop rails" Stop rails ATM use the aforementioned things to add a pointwise "2" speed restriction. Seems to work. | ||
* | Implement new position encoding function and benchmark it | orwell96 | 2018-11-29 |
| | | | | | This shall replace all "pos_to_string" hashes in the long term. Performs a bit better than pos_to_string (but still worse than the "nested tables" layout the nodedb uses (an unmatched open parenthesis leaves a tension that will stay all day... 2 do even more | ||
* | Fix discouple positioning when wagon was just loaded | orwell96 | 2018-11-20 |
| | |||
* | Add set_aspect function | orwell96 | 2018-11-20 |
| | | | | | This allows incorporating signals implementing the signal API in LuaAutomation projects Note that it circumvents TCB assignments (a signal assigned to a TCB can be set to green even if no route is set | ||
* | Add Note regarding pcnaming and interlocking signals | orwell96 | 2018-11-20 |
| | |||
* | Remove superfluous "tarvelocity" assignments | orwell96 | 2018-11-20 |
| | |||
* | Make "Line" property accessible from OBC and gettable via LATC, change ↵ | orwell96 | 2018-11-20 |
| | | | | subway wagon texture handling | ||
* | Remove debug print | orwell96 | 2018-11-20 |
| | |||
* | Permit basic signal aspect setting | orwell96 | 2018-11-19 |
| | | | | (basically only usable with Ks signals, because they're the only signals supporting slow move and/or shunt move | ||
* | Fix protection regarding tracks (track_builder and railway_operator) and ↵ | orwell96 | 2018-11-12 |
| | | | | documentation on privileges | ||
* | Increase savefile version to 2 | orwell96 | 2018-11-10 |
| | | | | (Master downgrade protection) | ||
* | Remove "couple locks" and apply protection to the actual coupling process, ↵ | orwell96 | 2018-11-10 |
| | | | | and fix permissions on that | ||
* | Ks signals emit some light | orwell96 | 2018-11-05 |
| | | | | Else you can't see them in the dark... | ||
* | Allow pcnaming for any signals | orwell96 | 2018-11-05 |
| | |||
* | Replace "Allow accelereting train towards signal" | orwell96 | 2018-10-30 |
| | | | | This is a better implementation of the same goal. The last commit caused trains to overrun the IP sometimes. Haven't noticed so far with this approach | ||
* | No static_save for discouple entities | orwell96 | 2018-10-30 |
| | |||
* | Make fillout_aspect also fill "info" field | orwell96 | 2018-10-30 |
| | |||
* | Do not allow static signals for routesetting | orwell96 | 2018-10-30 |
| | |||
* | Fix Ks signals not setting aspect (missing set_aspect function) | orwell96 | 2018-10-30 |
| | |||
* | Document fix 0a982b6356b2f4b6a28e74f9f90c4f584169a96d | orwell96 | 2018-10-29 |
| | | | | Add comment that explains why fix was necessary | ||
* | Actually set last_connid to 1, to prevent warning | orwell96 | 2018-10-29 |
| | |||
* | Do not print "couldn't determine section" warning when all traverser ends ↵ | orwell96 | 2018-10-29 |
| | | | | were end-of-track | ||
* | Handle the case that a train is not initialized (train_ensure_init returns ↵ | orwell96 | 2018-10-29 |
| | | | | | | nil/false) Fixes H#72 | ||
* | Allow to accelerate trains slowly towards red signals from stand. | orwell96 | 2018-10-29 |
| | | | | Previously, it was impossible to accelerate a standing train once it was ~10m in front of a red signal. | ||
* | Fix typo in signal assignment, causing crash | orwell96 | 2018-10-29 |
| | |||
* | Miscellaneous routesetting fixes | orwell96 | 2018-10-29 |
| | | | | | | | - Move handling of "route_committed" to the routesetting function - Put aspect in every TCBS on the way - Add "route_origin" to TCBS fields to prevent subroute cancelling - Cancel entire route when another train enters from the wrong TCB | ||
* | atdump() to treat certain values special | orwell96 | 2018-10-29 |
| | |||
* | Fix signal_get_aspect() | orwell96 | 2018-10-29 |
| | | | | Had a series of bugs as result, like auto-clearing IPs and not-working lzb | ||
* | Small fixes which do not have any effect | orwell96 | 2018-10-29 |
| | |||
* | Add Interlocking Tool to inspect route locks | orwell96 | 2018-10-26 |
| | |||
* | Add "Reset track section" function | orwell96 | 2018-10-26 |
| | |||
* | Complete Ks Main signals | orwell96 | 2018-10-26 |
| | |||
* | Fix demo signals | orwell96 | 2018-10-25 |
| | |||
* | Add doc for supported_aspects, improve other doc and aspect autofill | orwell96 | 2018-10-25 |
| | |||
* | Display route_rsn when denying routesetting by subroute locked. | orwell96 | 2018-10-25 |
| | |||
* | Fix node database ATC rail bug | orwell96 | 2018-10-17 |
| | | | | | | | After successfully registering newly-placed ATC rails in the nodedb, the rail's after_place_node() callback (local apn_func()) immediately cleared it again by passing a "node" object that was actually a player object and thus had no "name" or "param2" to ndb.update(), which it handled how it should not in this situation. Since those ndb.update calls were unnecessary anyways, I removed them completely. | ||
* | Prevent any user control except "Brake" when an ATC override is present | orwell96 | 2018-10-17 |
| | | | | Solves the problem of accidentally breaking atc-driven trains | ||
* | Improve ATC-LZB-User control interaction, smoothen LZB control operations | orwell96 | 2018-10-17 |
| | | | | (prevent flickering view when atc battles against lzb) | ||
* | Address H#60, H#17, M#18 and M#7 | orwell96 | 2018-10-17 |
| | | | | | | | duplicate "message" to "msg" make operation panel "cracky" remove inexistent dtime_s parameter add bones:bones to the list of not_blocking_trains nodes | ||
* | Fix H#69 | orwell96 | 2018-10-17 |
| | | | | Cause was a cascaded crash, original cause was something different | ||
* | Fix H#66 (Hemiptera 66) crash on missing double_conn match | orwell96 | 2018-10-17 |
| | |||
* | Actually allow what manual promises (setting IP on non-assigned signals) | orwell96 | 2018-10-17 |
| | |||
* | Update manual again | orwell96 | 2018-10-15 |
| | |||
* | Properly handle speed restrictions | orwell96 | 2018-10-10 |
| | |||
* | Remote Routesetting from Onboard Computer | orwell96 | 2018-10-10 |
| | | | | + Fix lzb oncoming item deletion/speed restriction | ||
* | Properly implement invalidate_all_paths, recheck lzb on aspect change | orwell96 | 2018-10-10 |
| | |||
* | Add signal safety control override, restructure control system | orwell96 | 2018-10-10 |
| | |||
* | Make signal influence point (~halt point) specifiable | orwell96 | 2018-10-09 |
| | | | | Also extend signal api necessarily | ||
* | Improve route programming: | orwell96 | 2018-10-07 |
| | | | | | | | - Formspec for TCBs instead of unhandy chatcommands - Ability to advance route over the next secction without punching end - Better visualization - Ability to route into dead-end sections | ||
* | Fix route programming lock-placement | orwell96 | 2018-09-28 |
| |