Commit message (Expand) | Author | Age | |
---|---|---|---|
* | Shunt signals (not exactly Ks), along with fixes in other components that tho... | orwell96 | 2018-12-08 |
* | Miscellaneous routesetting fixes | orwell96 | 2018-10-29 |
* | Add Interlocking Tool to inspect route locks | orwell96 | 2018-10-26 |
* | Add signal safety control override, restructure control system | orwell96 | 2018-10-10 |
* | Add 'interlocking' privilege and add security checks | orwell96 | 2018-08-12 |
* | Uncommitted route handling (update_route function) | orwell96 | 2018-08-03 |
* | Implement routesetting | orwell96 | 2018-07-21 |
* | Signal assignment and route programming procedure | orwell96 | 2018-07-04 |
* | get_ts_at_pos(), file for train-related stuff | orwell96 | 2018-06-29 |
* | Add track section concept and rework TCB design, implement new linking behavior | orwell96 | 2018-06-21 |
* | Add Track Circuit Breaks (TCBs), Database and Track Circuit Setup | orwell96 | 2018-06-20 |
* | Interlocking: Create demo signals, signal API and model for TCB configurer node | orwell96 | 2018-06-19 |
* | Draft of interlocking system | orwell96 | 2018-06-14 |