aboutsummaryrefslogtreecommitdiff
path: root/advtrains_interlocking/init.lua
Commit message (Expand)AuthorAge
* Connect the ropes, start on making the UI workorwell2024-05-23
* Merge branch 'new-ks-orwell' into route_prog_reworkorwell2024-04-08
|\
| * Start changing APIs and applying proof-of-concept to ks signalsorwell2024-02-06
| * Cancel type 2 signals; introduce signal groups for all signalsY. Wang2023-03-26
| * Add API documentationY. Wang2023-03-23
| * Implement primitive distant signalingY. Wang2023-03-23
| * Implement basic route signaling with Japanese signals for demoY. Wang2023-03-23
* | Forget it, and use the old preset tables for track registration. Just adapt i...orwell2023-10-15
* | Begin major rework of track registration systemorwell962023-09-04
|/
* Move LZB system to core and unify approach callback mechanismorwell962019-04-16
* Point speed restriction railsorwell962019-01-24
* Add Automatic Routesetting UIorwell962019-01-09
* Shunt signals (not exactly Ks), along with fixes in other components that tho...orwell962018-12-08
* Miscellaneous routesetting fixesorwell962018-10-29
* Add Interlocking Tool to inspect route locksorwell962018-10-26
* Add signal safety control override, restructure control systemorwell962018-10-10
* Add 'interlocking' privilege and add security checksorwell962018-08-12
* Uncommitted route handling (update_route function)orwell962018-08-03
* Implement routesettingorwell962018-07-21
* Signal assignment and route programming procedureorwell962018-07-04
* get_ts_at_pos(), file for train-related stufforwell962018-06-29
* Add track section concept and rework TCB design, implement new linking behaviororwell962018-06-21
* Add Track Circuit Breaks (TCBs), Database and Track Circuit Setuporwell962018-06-20
* Interlocking: Create demo signals, signal API and model for TCB configurer nodeorwell962018-06-19
* Draft of interlocking systemorwell962018-06-14