aboutsummaryrefslogtreecommitdiff
path: root/advtrains_interlocking
Commit message (Collapse)AuthorAge
* Add Interlocking Tool to inspect route locksorwell962018-10-26
|
* Add "Reset track section" functionorwell962018-10-26
|
* Fix demo signalsorwell962018-10-25
|
* Add doc for supported_aspects, improve other doc and aspect autofillorwell962018-10-25
|
* Display route_rsn when denying routesetting by subroute locked.orwell962018-10-25
|
* Improve ATC-LZB-User control interaction, smoothen LZB control operationsorwell962018-10-17
| | | | (prevent flickering view when atc battles against lzb)
* Actually allow what manual promises (setting IP on non-assigned signals)orwell962018-10-17
|
* Remote Routesetting from Onboard Computerorwell962018-10-10
| | | | + Fix lzb oncoming item deletion/speed restriction
* Properly implement invalidate_all_paths, recheck lzb on aspect changeorwell962018-10-10
|
* Add signal safety control override, restructure control systemorwell962018-10-10
|
* Make signal influence point (~halt point) specifiableorwell962018-10-09
| | | | Also extend signal api necessarily
* Improve route programming:orwell962018-10-07
| | | | | | | - Formspec for TCBs instead of unhandy chatcommands - Ability to advance route over the next secction without punching end - Better visualization - Ability to route into dead-end sections
* Fix route programming lock-placementorwell962018-09-28
|
* Add LuaAutomation interface functions for interlocking routesetting and ↵orwell962018-08-24
| | | | | | aspect requesting. This allows to incorporate interlocking to automated systems
* Move passive API to the advtrains coreorwell962018-08-16
| | | | to remove dependency of interlocking on luaautomation
* Fix various bugs found while testingorwell962018-08-13
|
* Add 'interlocking' privilege and add security checksorwell962018-08-12
|
* Automatic working (re-set certain route on train pass)orwell962018-08-12
|
* fix digging unconfigured tcbsorwell962018-08-12
|
* Signal aspect handling, make default signals compatible, fix signal diggingorwell962018-08-12
|
* Add routesetting callbacks.orwell962018-08-12
| | | | Now, only the signal aspect setting is still missing
* Uncommitted route handling (update_route function)orwell962018-08-03
|
* Implement routesettingorwell962018-07-21
| | | | Missing things: signal aspect updating, waiting routes handling, management /info tool
* Change stuff on route programming, begin routesettingorwell962018-07-17
|
* Basic route management from signalling formspecorwell962018-07-04
|
* Signal assignment and route programming procedureorwell962018-07-04
|
* Implement trains blocking sectionsorwell962018-06-29
|
* get_ts_at_pos(), file for train-related stufforwell962018-06-29
|
* Complete Track Section handling, incl. removing tcb's and marker entitiesorwell962018-06-26
|
* Add track section concept and rework TCB design, implement new linking behaviororwell962018-06-21
|
* Add Track Circuit Breaks (TCBs), Database and Track Circuit Setuporwell962018-06-20
| | | | Does not get saved yet.
* Interlocking: Create demo signals, signal API and model for TCB configurer nodeorwell962018-06-19
|
* Draft of interlocking systemorwell962018-06-14