aboutsummaryrefslogtreecommitdiff
path: root/advtrains_line_automation
Commit message (Collapse)AuthorAge
* lines: fix very dumb typo breaking the "add" and "diff" functionorwell962019-11-06
|
* lines: Add rwt adapt mode to adapt to real timeorwell962019-11-06
|
* lines: document scheduler betterorwell962019-11-06
|
* Secure inputs to scheduler so that they don't get recognised when executing ↵orwell962019-08-29
| | | | the schedule
* Add lines scheduler for reliable railway-time scheduling(which is also safer ↵orwell962019-08-26
| | | | than the atlatc scheduler) and document new atlatc functions
* math.floor triggers error if it gets something nilGabriel Pérez-Cerezo2019-07-20
|
* Prevent injection of floating-point delays, that wreck advtrainsGabriel Pérez-Cerezo2019-07-20
|
* Added option to modify departure speed and door delayGabriel Pérez-Cerezo2019-07-20
| | | | | The door delay is the time between when the doors start closing and the train departs.
* RWTs can be specified in any form, unify converters, repeating time handlingorwell962019-06-19
|
* Omit cycle in to_Stringorwell962019-06-19
|
* Railway Time: atlatc interface, improve util functionsorwell962019-06-19
|
* Railway Time: Basic time counter and utility functionsorwell962019-06-19
|
* Move LZB system to core and unify approach callback mechanismorwell962019-04-16
|
* Add ARS rules for stop railsorwell962019-02-19
|
* Move "Reverse" command in stoprail to directly before departureorwell962019-02-19
|
* Fix stop rails sometimes not sending stop commandorwell962019-02-16
|
* Small stoprail fixesorwell962019-02-11
|
* Minor Bugfixesorwell962019-02-03
|
* Basic functions of "stop rail", missing ARS rules and signal.orwell962019-01-24
| | | | For signal, need to think of a callback system for signals and moving atlatc queue to core?
* Point speed restriction railsorwell962019-01-24
|
* Signs (static signals)orwell962018-12-08
|
* no debugpringorwell962018-11-29
|
* Added on_train_approach callback, non-permanent external LZB brakepoints and ↵orwell962018-11-29
basis for "stop rails" Stop rails ATM use the aforementioned things to add a pointwise "2" speed restriction. Seems to work.